Steel Structures and Prefabricated Buildings
For overseas EPC, industrial parks, logistics warehousing and public construction projects, it supports supply scope confirmation, design interface coordination, quality inspection, zoning packaging and international delivery.
Four core advantages
Complete set supply boundary
The main structure, enclosure, connections, supporting systems and technical documents are confirmed according to the list.
Design interface coordination
Check civil engineering, mechanical and electrical, energy, site conditions and local standards in advance.
Quality plan management
Materials, manufacturing, welding, anti-corrosion and factory documents are executed according to approved nodes.
Partition packaging delivery
Numbered by system, floor, area and installation sequence, supports batch shipment.
Typical application scenarios
Industrial plant
Production workshop, assembly plant and basic equipment supporting facilities.
Logistics and Warehousing
Long-span warehouses, distribution centers and cold chain buildings.
Prefabricated building
Offices, dormitories, camps and modular public spaces.
Overseas EPC project
Complete supply coordinated with civil engineering, electromechanical and process systems.
Public buildings
Sports, exhibition, transportation and municipal supporting buildings.
Government and Institutional Procurement
Perform according to approved technical documents, acceptance and document requirements.
Parameters and Inquiry Confirmation Form
Steel structure projects cannot be quoted separately from location, load, specification and interface. Please try to provide the following information.
| Project location and environment | Country, city, wind and snow conditions, corrosive environment, earthquake defense and on-site transportation restrictions |
|---|---|
| Design basis | Applicable specifications, owner’s technical conditions, approved drawings or conceptual plans |
| Structure type and scale | Span, column spacing, cornice height, building area, number of floors and lifting equipment conditions |
| Loading and usage conditions | Dead load, live load, wind and snow load, crane load, equipment load and special working conditions |
| Scope of supply | Main steel structure, enclosure, doors and windows, connectors, fire protection and anti-corrosion, installation services and file boundaries |
| Surface and Protection | Painting, hot-dip galvanizing, fire protection system and target usage environment |
| Delivery Plan | Planned quantity, partition and batch requirements, destination port, site sequence and project nodes |
Quality Inspection
Establish a chain of evidence for materials, fabrication, finishing and documentation around approved drawings and quality plans.
Materials and Manufacturing
- Material certificate, specification, heat batch and component number
- Cutting, assembly, welding and dimensional inspection
- Non-destructive testing and necessary process assessment
- Surface preparation before anti-corrosion or fire protection treatment
Factory and documentation
- Component size, hole location, connectors and pre-assembly inspection
- Coating thickness, appearance and repair records
- Packing list, assembly drawings, qualification information and delivery documents
- Arrange third-party inspection as agreed in the contract

Packaging and export delivery
Large components are organized according to installation sequence and shipment batch to avoid on-site search, mixed installation and version mismatch.
| Assembly number | Be consistent with the drawings, packing list, and installation area |
|---|---|
| Packaging method | Large components are bundled and fixed, small parts are classified and packed in boxes, and precision parts are strengthened against moisture and shock. |
| Shipping Organization | Select container, frame box or breakbulk solution according to size and weight |
| Delivery documents | Business documents, packing list, quality information, assembly drawings and necessary instructions |