STEEL STRUCTURE · PREFAB SYSTEM

Steel Structures and Prefabricated Buildings

For overseas EPC, industrial parks, logistics warehousing and public construction projects, it supports supply scope confirmation, design interface coordination, quality inspection, zoning packaging and international delivery.

Project TypeIndustrial and Public Buildings
Execution methodConfirm by item list
Quality DocumentSubmit as per approved plan
Delivery OrganizationPartition, batch, traceability
CORE ADVANTAGES

Four core advantages

01/SCOPE

Complete set supply boundary

The main structure, enclosure, connections, supporting systems and technical documents are confirmed according to the list.

02 / INTERFACE

Design interface coordination

Check civil engineering, mechanical and electrical, energy, site conditions and local standards in advance.

03 / QUALITY

Quality plan management

Materials, manufacturing, welding, anti-corrosion and factory documents are executed according to approved nodes.

04 / DELIVERY

Partition packaging delivery

Numbered by system, floor, area and installation sequence, supports batch shipment.

APPLICATIONS

Typical application scenarios

Industrial plant

Production workshop, assembly plant and basic equipment supporting facilities.

Logistics and Warehousing

Long-span warehouses, distribution centers and cold chain buildings.

Prefabricated building

Offices, dormitories, camps and modular public spaces.

Overseas EPC project

Complete supply coordinated with civil engineering, electromechanical and process systems.

Public buildings

Sports, exhibition, transportation and municipal supporting buildings.

Government and Institutional Procurement

Perform according to approved technical documents, acceptance and document requirements.

PROJECT INPUT & RFQ

Parameters and Inquiry Confirmation Form

Steel structure projects cannot be quoted separately from location, load, specification and interface. Please try to provide the following information.

Project location and environment Country, city, wind and snow conditions, corrosive environment, earthquake defense and on-site transportation restrictions
Design basis Applicable specifications, owner’s technical conditions, approved drawings or conceptual plans
Structure type and scale Span, column spacing, cornice height, building area, number of floors and lifting equipment conditions
Loading and usage conditions Dead load, live load, wind and snow load, crane load, equipment load and special working conditions
Scope of supply Main steel structure, enclosure, doors and windows, connectors, fire protection and anti-corrosion, installation services and file boundaries
Surface and Protection Painting, hot-dip galvanizing, fire protection system and target usage environment
Delivery Plan Planned quantity, partition and batch requirements, destination port, site sequence and project nodes
QUALITY CONTROL

Quality Inspection

Establish a chain of evidence for materials, fabrication, finishing and documentation around approved drawings and quality plans.

Materials and Manufacturing

  • Material certificate, specification, heat batch and component number
  • Cutting, assembly, welding and dimensional inspection
  • Non-destructive testing and necessary process assessment
  • Surface preparation before anti-corrosion or fire protection treatment

Factory and documentation

  • Component size, hole location, connectors and pre-assembly inspection
  • Coating thickness, appearance and repair records
  • Packing list, assembly drawings, qualification information and delivery documents
  • Arrange third-party inspection as agreed in the contract
International ports and large project export delivery
PACKING & DELIVERY

Packaging and export delivery

Large components are organized according to installation sequence and shipment batch to avoid on-site search, mixed installation and version mismatch.

Assembly number Be consistent with the drawings, packing list, and installation area
Packaging method Large components are bundled and fixed, small parts are classified and packed in boxes, and precision parts are strengthened against moisture and shock.
Shipping Organization Select container, frame box or breakbulk solution according to size and weight
Delivery documents Business documents, packing list, quality information, assembly drawings and necessary instructions
page is used to describe the product and project execution scope and does not replace the project technical agreement. Structural parameters, design responsibilities, certifications, construction entities and acceptance criteria must be confirmed in writing with the contract based on the project site.
PROJECT ASSESSMENT

Submit project location, drawings and supply boundaries

We will first check the technical input completeness and then organize the design of interfaces, suppliers and delivery solutions.

Submit project information