
Photovoltaic and Energy Storage Systems
Photovoltaic and Energy Storage Systems serves overseas EPC, industrial-park and public-infrastructure projects, covering supply-scope confirmation, technical-interface coordination, quality inspection, packing and international delivery.
Products and Applications
Photovoltaic and Energy Storage Systems serves overseas EPC, industrial-park and public-infrastructure projects, covering supply-scope confirmation, technical-interface coordination, quality inspection, packing and international delivery.
Overseas EPC and Infrastructure Projects
Industrial Parks and Public Buildings
Government and Institutional Procurement
Contractor Turnkey Equipment Procurement
Inquiry and Configuration Confirmation
Specific model numbers, specifications, and supply scope shall be governed by project technical documents, approved drawings, and the final purchase order.
| Supply Scope | Main equipment, associated systems, spare parts, and technical documentation shall be confirmed per the project bill of materials. |
|---|---|
| Design Interfaces | Site conditions, energy supply conditions, civil works interfaces, and local standards must be confirmed in advance. |
| Project Execution | Detailed engineering design, supplier coordination, inspection, packaging, and delivery scheduling shall be managed in phased implementation. |
| Quality Documentation | Material, manufacturing, inspection, and factory acceptance documentation shall be submitted per the approved quality plan. |
| Quotation Documentation | Project location, technical specifications, supply scope, planned quantities, and delivery milestones. |
Quality Inspection
- Supply scope shall be controlled per approved technical documentation.
- Material, manufacturing, and functional inspections shall be executed per the approved quality plan.
- Inspection, packing, and delivery documentation shall be organized by subsystem.
Packaging and Export Delivery
- Packaging shall be numbered by system, zone, and installation sequence.
- Moisture- and shock-resistant reinforcement shall be applied to precision, electrical, and corrosion-prone components.
- Shipment batches shall be coordinated with on-site construction schedules.
Key Project Execution Points
Requirement Confirmation
Confirm intended use, specifications, quantities, applicable standards, and delivery destination.
Technical Review
Verify product configuration, project interfaces, documentation requirements, and supply scope.
Quality Control
Conduct manufacturing inspections, factory acceptance tests, and documentation compilation per the approved plan.
Export Delivery
Implement coordinated packaging, shipment, documentation, and destination port delivery.
Obtain Product Solutions and Quotation
Please provide project location, intended use, specifications, quantities, applicable standards, and delivery schedule.
-110x110.png)