Diesel Generator Sets and ATS Control Panels
Standby and prime-power packages configured around real load steps, ambient conditions, emission requirements, acoustic limits and automatic transfer logic.
From requirement to controlled export delivery
Correct power sizing
Check starting current, motor loads, nonlinear loads and altitude/temperature derating.
Complete power package
Coordinate engine, alternator, controller, breaker, ATS, tank and enclosure.
Documented factory tests
Verify protections, voltage/frequency response, transfer logic and agreed load steps.
Maintenance planning
Define filters, belts, fluids, recommended spares and service access before shipment.
Typical applications
Buildings
Emergency and life-safety backup subject to local code.
Industrial plants
Standby or prime power for defined process loads.
Construction sites
Temporary power with suitable distribution and protection.
Data and telecom
Backup packages sized for sensitive and nonlinear loads.
Remote operations
Prime power where utility supply is unavailable.
Hybrid microgrids
Generator coordination with solar and battery storage.
Specification and RFQ checklist
A reliable quotation starts with the operating conditions, applicable standards, quantity and destination—not only a reference model.
| Power basis | kW/kVA, standby or prime rating, power factor and load profile |
|---|---|
| Engine | Brand/model, speed, fuel quality, cooling and emission requirement |
| Alternator | Voltage, frequency, insulation, excitation and voltage regulation |
| Controller | Protection, remote start, communication and synchronization requirements |
| ATS | Poles, rated current, transfer mode, bypass and mechanical/electrical interlock |
| Environment | Altitude, temperature, dust, rain, corrosion and acoustic limit |
| Fuel system | Base tank/day tank, autonomy, piping and local fire-safety boundary |
Inspection and document control
Inspection items and documents are agreed against the final configuration and target market before production or shipment.
Factory acceptance
- Nameplate and component verification
- Insulation, protection and wiring checks
- No-load and agreed load-step testing
- ATS transfer and alarm-function test
Delivery package
- Test report and configuration sheet
- Wiring diagrams and manuals
- Initial filter and spare-parts recommendation
- Packing, lifting and storage instructions
Commercial and export execution
Delivery time, inspection, warranty and logistics are confirmed according to the selected product, project urgency and destination conditions.
| Lead time | By engine/alternator availability and enclosure/control configuration |
|---|---|
| Fuel | Units shipped according to transport rules; site fuel and commissioning defined separately |
| Installation | Ventilation, exhaust, foundation, cabling and earthing reviewed by local engineers |
| Warranty | Model- and contract-specific under approved operating and maintenance conditions |
Send specifications, quantity and destination
We will check technical completeness, available configurations, documentation and shipment options before issuing a formal quotation.