




Fire Pump Inspection Cabinet
Automated inspection and status monitoring for fire pumps, sprinkler pumps, and similar equipment; reduces failure risk from prolonged pump inactivity via periodic low-frequency or low-speed operation.
Product Overview and Technical Documentation
Product Overview
Automated inspection and status monitoring for fire pumps, sprinkler pumps, and similar equipment; reduces failure risk from prolonged pump inactivity via periodic low-frequency or low-speed operation.
Project Positioning
This product is integrated into Luyu International Group’s overseas supply system targeting engineering projects, distribution channels, and professional procurement entities; supports specification confirmation, supplier verification, quality control, export packaging, and delivery coordination.
Technical Parameters and Specification Confirmation
| Rated Operating Voltage | AC 380V |
|---|---|
| Rated Insulation Voltage | AC 660V |
| Current Rating | 100A, 225A, 400A, 630A (reference) |
| Inspection Cycle | Manufacturer’s documentation example: 24 hours; adjustable per project |
| Inspection Duration per Pump | Manufacturer’s documentation example: 10 minutes; adjustable per project |
| Main Switch Breaking Capacity | 15kA (reference) |
| Enclosure Protection Rating | IP30 (reference) |
Page parameters are compiled from cooperating manufacturers’ current technical documentation; specific model, dimensions, performance, color, accessories, and certification scope must be confirmed item-by-item during quotation and contract stages.
Application Scenarios
- Fire pump rooms and sprinkler systems
- Hospitals, schools, and public buildings
- Commercial complexes and high-rise buildings
- Industrial plants and warehousing facilities
Quality Control and Inspection
- Manufacturer’s documentation references GA 30.2-2002 requirements
- Interface compatibility with fire main controller, pump control cabinet, bypass, and alarm systems verified uniformly
- Functional testing of inspection logic, fire-priority suspension of inspection, and fault alarm activation
Supports verification against agreed technical documents for raw materials, appearance, dimensions, assembly, functionality, and factory documentation; third-party inspection or witnessed testing may be stipulated if required by the project.
Packaging and Delivery
Moisture-proof, scratch-resistant, impact-resistant, wooden crate or pallet packaging confirmed based on product attributes, transport distance, destination port, and on-site unloading conditions; accompanied by packing list, labels, and export documentation.
Project Procurement and Export Delivery
Requirement Clarification
Confirm application, drawings, specifications, quantity, destination country, and delivery milestones.
Technical Verification
Verify materials, dimensions, performance, surface treatment, and target market standards.
Quality Inspection
Execute sample, in-process, factory acceptance, or third-party inspection as agreed.
Export Delivery
Confirm packaging, labeling, documentation, container loading, and international logistics plan.
Request Quote
Serving international engineering projects, distribution channels, and professional purchasers with specification confirmation, supplier verification, quality control, packaging, and coordinated export delivery.
-110x110.png)